0

Scheduled report takes longer than running manually

Hi, I have a simple jet report that retrieves a list of posted orders for the last x months. I have an options tab that auto calculates the X period. When i run the report manually, it takes about 40 seconds. 

When I schedule it, it takes almost 18-20 minutes based on the log file. The only additional thing that the scheduler is doing is saving the output, logging the results and emailing the attachment. 

I have other scheduled jet reports and they run fairly quickly on the same server that I am scheduling it on. Any ideas as to what could be slowing it down this much? 

 

Ajit

0 comments

Please sign in to leave a comment.