0

schedular+design

schedular- i need a step by step guide to use schedular and how to use design better.


I have a report that is not quite completed which takes about 45 mins to run. I am ironing out the errors in the report but every time i make a change ,the report runs and i have to wait long time before I can make changes.What is the correct way to make changes? I could go in design mode, but again i need to refresh when i have made changes. I want to be solve the problems in my report task by task without having to keep running report to see if i have fixed something.

Also because the report takes so long to run, can i set it up in schedular to run automatcially in the morning ,so when i come into work the report is run?

I find jet ok but get a bit frustrated that there are not many instructions how to use it

2 comments

Please sign in to leave a comment.