I am new to this forum to sorry if I have posted this in the wrong place.
I am using the jet scheduler to run a specific report on a daily basis for the current weeks date range.
I use excel formulas to calculate the date range so that at the beginning of a new week the formulas update to show the new weeks date range.
I have a few reports using the technique describes above however I am now trying to create another scheduled report and the scheduler won't load/recognise the date options ranges and the report dates won't change?
This means that the report continues to run for a fixed date range and is no longer dynamic.
Any help with this would be appreciated.
Thanks in advance
C